The Project. General Features.
Class A+ Building
- Delivering Q4 of 2025
- 73,390 RSF of Office/R&D
ESG
- LEED Platinum
- All electric building, with no onsite greenhouse gas emissions.
- Net Zero Energy & Zero Net Carbon operation
Power
- 3,000 amps (expandable)
- Increased electrical resiliency via battery and microgrid.
- Landlord to future proof site by running additonal conduit to accomodate occupiers with increased power need.
Class A+ Building
- 40’x40’ grid
Green Space
- 2 Acres of open and green spaces
Parking
- 2 level, 330 stall parking garage including 60+ EV charging stations
- Additional 73 surface level parking stalls
Indoor Air Quality
- MERV 13 air filters will be provided at all outdoor air supplies to ensure adequate air quality
Clear Height
- Minimum 17’ clear height
- Up to 36’ clear height in high bay areas
Solar
- Up to 2,000 amps of production
Skylights
- The Cannery is designed to maximize the amount of natural daylight entering the space through the use of skylights, light tubes, and clerestory spaces

Construction Timeline

Highly connected. Transit oriented.
Relax in the Park
Take a call or take a breath in the adjacent 2 acres of lush green & open spaces.
Mixed Use Office/ R&D Project
The Cannery will be adjacent to 74 future townhomes and is perfectly situated in the heart of Palo Alto’s housing community.
THE CANNERY | PALO ALTO
340 PORTAGE AVENUE | ±73,390 SF CLASS A+ OFFICE/R&D
CHRISTIAN PRELLE
CARTER LYMAN
The distributor of this communication is performing acts for which a real estate license is required. The information contained herein has been obtained from sources deemed reliable but has not been verified and no guarantee, warranty or representation, either express or implied, is made with respect to such information. Terms of sale or lease and availability are subject to change or withdrawal without notice. MP-992 |1/25
